How many project revisions have you seen end without anything changing? The slides slide, the numbers are "in line", everyone nods and you leave the room with the same list of actions as the previous time, plus a few new promises. For a PMO the cost is double: preparation time wasted and problems that re-emerge identical to the next cycle. The problem is almost never the quality of the slides: it's that the review wasn't designed to decide.
This article proposes a concrete format: ten questions, to be asked in this order, which transform the review from a ritual to a decision gate. The idea is not new: in the product development literature, thestage-gate modeldivides the project into phases separated by reviews in which it is decided whether to continue, correct or stop. The point is that the gate only works if it ends in decisions. A review that changes nothing is not a review: it is a ritual.
Before the hall: three conditions
A review that decides is being prepared. Three conditions, without which it is better to postpone.
- Updated and verified data.If the report is not up to date, the first decision of the meeting will be "postpone". The numbers update before, not during.
- Pre-reading.The slides are read in advance, twenty-four or forty-eight hours in advance; the meeting is for questions, not reading aloud.
- The right people.Whoever has the power to decide - sponsor, function manager, internal customer - must be in the room. A review without decision makers produces at most recommendations.
A time limit helps: an untimed review stretches until you run out of slides, a timed one focuses on decisions.
The 10 questions
1. What is the economic status of the project today?
Approved budget, costs incurred, commitments already made and final estimate. "We are in line" is not enough: we need numbers and comparison with the baseline. If the final estimate exceeds the budget, it is declared here, with the difference and the explanation.
2. What deviations are there and with what evidence?
Every deviation - in cost, time, quality - must be linked to evidence: a date, a document, a measurement. Quantitative control techniques, such as earned value analysis, exist for exactly this: to transform a variance into something measurable and verifiable (a recent proposal combines earned value and Monte Carlo simulation). The evidence may be simple — a contract, a test date, an extraction from the system — but it must exist and be cited. A deviation without evidence is not a problem: it is an opinion.
3. What are the three main risks and what triggers them?
Not the full risk register: the three that can derail the project. For each: probability, impact, early warning and mitigation action already underway. If a risk does not have an early signal, it is not managed.
4. Which decisions are open and for how long?
Every postponed decision is a cost: it blocks activities, consumes options, fuels uncertainty. The list of open decisions, with age and block, is the heart of the review. In my opinion, if the list doesn't get shorter between revisions, decision making is the number one project problem.
5. What data are missing to decide?
If a decision cannot be made because data is missing, the missing data is the first topic of the meeting, not the last: who gets it, by when, with what impact if it doesn't arrive. There is a dedicated article on this path: [missing data is the risk that no one sees in the reports](/controlroom/guide/data-missing-risk-projects/).
6. What has changed since the last revision?
Perimeter, requirements, resources, priorities, context. The best reviews measure the distance between today and the previous decision, rather than starting from scratch each time. If there is no trace of the previous decision to compare, question 6 is already an answer: the minutes are missing.
7. What is the next concrete move and who makes it?
We don't "move on multiple fronts": an action, a person responsible, a date. If the meeting ends without anyone knowing what they'll do tomorrow morning, the review isn't over: it's just over.
8. What do you need from those who are not in the room?
Dependencies on suppliers, other functions, customers: you come out with a list of precise requests - what, to whom, by when - not with "must be involved". Vague requests are the polite form of another postponed decision.
9. What is plan B?
If plan A doesn't hold, what do we do? Alternative options, costs and activation times, conditions that would trigger the alternative. A review that never discusses the alternative is only confirming the plan, not verifying it.
10. When will we meet again and with what success criteria?
The next review has a date and a criterion: what must be true between now and then for the decisions made today to be confirmed as right. A gate without a verification criterion at the next gate is a door without a key.
How to close it: the minutes of decisions
The review ends with a short report listing: decisions made, responsible person, deadline; and decisions still open, with whoever unlocks them. Not a minute of discussion: a minute of decisions. If a decision is not mature, we say so and transform it into missing data to be recovered by a specific date. The minutes close in the room, before everyone returns to the urgent matters: writing down the decisions immediately avoids weeks of interpretations.
The [project review kit](/project-review-kit/) — six DOCX templates ready to fill in, with minutes, checklist and question format — exists precisely for this reason: to structure the review without rebuilding it from scratch every time. If you want another angle on the same topic, also read [project review questions](/articles/project-review-questions/).
And the numbers to answer?
Questions 1, 2 and 3 require data that must be ready before the room: costs, progress, risks. A well-done [progress report](/project-status-report/) or an [executive dashboard](/controlroom/guide/executive-project-dashboard/) make the difference between a review that decides in half an hour and one that puts off another week. If the numbers are not there, the first decision has already been made: we start from the missing data, not from the slides.
The next step
Take the next already planned review and apply the ten questions: you will immediately see which answers you don't have. Those missing answers are your work plan for the days before the meeting. To start with the ready structure, download the [review kit] templates(/project-review-kit/); if you want to see how the dataset is prepared before entering the room, start with a [free ControlRoom guided demo](/controlroom/demo/).